Guru Nanak Secondary School
Hayes, Middlesex
New Build
 Sitecam Available »
The Phase 2 works at the Guru Nanak Sikh VA schools consists of an extension and refurbishment of the existing 2 FE secondary school to enable the school to expand to become 4FE and cope with the ever changing school curriculum. Integrated Design Consultants worked with the school to gain the required DfES funding and planning permissions which required extensive negotiation as the site is within the green belt on the edge of a country park that is transformed into an area of outstanding Natural Beauty.
The £7.6M school expansion undertaken as a partnership between the school and the main contractor from Phase 1, comprises the refurbishment of 2 floors of the existing 3 storey main block to produce new science laboratories and IT/Business suites, the construction of a new 3 storey block including specialist multi-materials and arts spaces and the construction of a new 4 court Sports Hall and changing facilities.
Traditional materials have been used through out to continue the look from the existing secondary school and the new primary school whilst the new sports hall is constructed from a steel framed structure clad in a combination of composite vertical cladding and an on site constructed standing seam roof cladding.
|





|